Group charging stations (group charging systems) are charging stations that allow you to simultaneously charge a large number of electric vehicles at one time. They have high throughput and are reliable under various operating conditions. Group charging systems have a power electrical infrastructure allocated outside the charging station, and the charging itself is performed at the chargers connected to them. In fact, with a small number of electric vehicles, separate charging stations are quite justified, but when it comes to simultaneously charging a variety of electric vehicles, for example, electric bus depots, parking lots near supermarkets, entertainment centers, offices, etc., the operation of group charging systems becomes the most effective. It should be noted that the unit cost of a group charging system is much lower than the purchase of individual charging stations.
The main advantage of GreenTE group charging stations is the use of dynamic balancing (DB) technology for charging electric vehicles with direct current. Thanks to this technology, several electric vehicles can be charged simultaneously, with an even distribution of charge power.
The devices of the group charging stations are protected against overload, short circuit and external physical influences (complies with the IP-54 safety standard, which guarantees safety during use. Our devices are an excellent choice for those who want to charge their electric car quickly and safely.
“TOSHELECTROAPPARAT” is the first plant in Uzbekistan that manufactures, supplies, installs and launches group charging stations of various parameters based on customer requirements. Below is a list of devices currently being sold by the manufacturer. GreenTE group charging stations are a sure step into the future!
Contact our manager to make an order or get additional information.
GreenTE group charging stations
A low-voltage group charger with the following functions:
Integrated group charger of medium and low voltage, with the following functions:
A low-voltage group charger with the following functions:
Application
City electric transport
Public charging stations
Parkings
Airport
Other infrastructure objects
Others devices

GB/T DС 80kW
80kW DC charger with 2 GB/T DC connectors
Approximate charging time: 1-2 hours

GB/T DС 120kW
120kW DC charger with 2 GB/T DC connectors.
Approximate charging time: 1-1.5 hours

GB/T DС 240kW
240kW DC charger with 2 GB/T DC connectors.
Approximate charging time: 1 hour

GB/T DС 360kW
360kW DC charger with 2 GB/T DC connectors.
Approximate charging time: 1 hour less

GB/T АС 7kW
7kW AC charger with GB/T AC connector
Approximate charging time: 8-10 hours

GB/T АС 7kW
7kW AC charger with GB/T AC connector
Approximate charging time: 8-10 hours